FS 553.791 · For contractors & homeowners

Your inspection, on your schedule.

Florida law lets you hire a licensed engineer to perform plan review and building inspections in place of the building department. Same code, same rigor โ€” without the queue. We are that engineer.

Get a private provider quote

Why crews use it

What a private provider changes on your job.

Building departments inspect on their calendar. When the inspector doesn't show, the crew waits, the next trade slips, and a one-day item becomes a one-week item. Under FS 553.791 the required inspections are performed by the private provider's team and the results are filed with the building official โ€” the department's queue stops being your critical path.

For a homeowner mid-renovation, the same logic applies to your contractor's schedule โ€” and to how long your house is a job site.

The reduction reflects the plan review and inspection work the department no longer performs. It rarely makes the private provider free โ€” you are paying for responsiveness โ€” but it offsets the cost, and on larger projects the schedule savings dwarf both numbers.

Corrections that would take a resubmittal cycle at the counter get resolved in a phone call. And because we are a structural engineering firm, the jobs where inspections actually get hard โ€” concrete restoration, structural repairs, window and door replacements in the HVHZ โ€” are the jobs we already engineer.

1. The permit applicant elects to use a private provider and files the required written notice with the building official (the generator below drafts it).
2. We perform the plan review and file the compliance affidavit; the department issues the permit.
3. We perform the required inspections as the work proceeds and post the results.
4. At completion we certify the work; the building official issues the certificate of occupancy or completion.

The building official retains authority to audit โ€” the code is the same code. What changes is who shows up, and when. And the pathway just got stronger: HB 803, effective 1 July 2026, expanded the private provider framework and put hard deadlines on department reviews.

Tool

Draft your notice to the building official

Electing a private provider requires written notice to the building official with the permit application. Fill in the project and this drafts it โ€” print it, sign it, file it with your application. Nothing is stored or sent.

This draft follows the content required by FS 553.791 for the notice to the building official. Some jurisdictions publish their own election form โ€” check with the department, or send us the permit application and we will handle the filing with you.

BLOX Engineering · FL PE 84824 · COA CA32764

Put the inspection on your calendar, not theirs.

Send the address, the scope and the plans. We will quote the private provider services the same day.